Hazrat Shahjalal International Airport, Dhaka is Bangladesh’s prime airport, handling around 70% of both domestic and international air traffic of the country according to 2017 estimates, which might have increased by now. The soft launch of the 3rd terminal of the airport with increased capacity alone can neither make drastic improvement, nor is that the only development planned. The larger ‘Dhaka International Airport Expansion Project’ was approved in late 2017 by the Executive Committee of the National Economic Council (ECNEC) which is supposed to materialize in two phases. The third terminal is a part of the phase 1 of the expansion project. What other development is planned for the airport? Why is that even necessary?
The HSI Airport was initially constructed in 1941 during World War II, not as an airport, rather as a spare airstrip in Kurmitola, near the existing Tejgaon airstrip to operate warplanes towards the warfields of Kohima and Assam. After the partition of India and subsequent birth of East Pakistan (currently Bangladesh) in 1947, the Tejgaon airstrip was turned into a commercial airport, the first of its kind in the then East Pakistan. During the Indo-Pak war of 1965, Indian Air Force bombed the Kurmitola Airstrip, assuming it to be the Tejgaon Airstrip. Later in 1966, the then Pakistan government planned to reconstruct the Kurmitola airstrip with the construction of a terminal and an adjacent railway station. However, due to Pakistan’s subjugation of Bengali and their refusal to hand over power to the elected representative, Bangabandhu Sheikh Mujibur Rahman, the Liberation War of Bangladesh took place in 1971 and Bangladesh was born as a war-torn country. The Kurmitola airstrip was damaged during the war. Subsequent governments of Bangladesh decided to turn it into the prime airport of the country. During its establishment as the prime airport of the country, Hazrat Shahjalal International Airport (HSI Airport) had a capacity of handling 8 million passengers per year which is the same till date. However, air traffic has increased many folds over the years, mandating an expansion of the airport.
Increasing Traffic
Bangladesh’s air traffic had an unforeseen increase over the last decade. Although HSIA saw an average annual passenger growth rate of 6.17% from 1999 to 2015, the growth rate after 2006 jumped to 7.88%, indicating a significant rise in demand in recent years. In HSIA, the international passenger ratio was 77.2% in 1999. However, the ratio has risen steadily in subsequent years, reaching around 90% of all passengers by 2011.
Given that HSI Airport currently has a maximum capacity of handling 8 million passengers, according to International Civil Aviation Organization (ICAO) estimates (which includes assumptions regarding passengers carried by non-reporting airlines, hence can be less than the actual figures), in 2019, Bangladesh’s total number of air passengers stood at 6.2 million before COVID-19 and worldwide travel restrictions. According to the Civil Aviation Authority of Bangladesh (CAAB)’s master plan, the number of air passengers is projected to reach up to 13.5 million in 2025. A study conducted by JICA in March, 2017 estimated the 2025 air passenger number to reach 14.1 million passengers. Even though COVID has disrupted the rise of the number of air passengers, it’s still important to note that we are soon to exhaust HSI Airport’s passenger handling capacity of 8 million passengers per year.
On the other hand, during the Holy Hajj season when thousands of passengers travel to Saudi Arabia from Bangladesh, there is an increased seasonal demand. Hence the pressure of passengers is not uniform all over the year, it has periodic ups and downs – exposing the HSI Airport to its maximum capacity at times and causing passengers to suffer.
The number of passengers has a lot to do with the number of terminals and boarding bridges. The HSI Airport’s boarding bridges and belts as well as the overall capacity of the existing terminals are insufficient to ensure service according to the increasing demand. There are only 8 boarding bridges and belts, which are inadequate to serve the 350 flights on average everyday, which is supposed to increase to 420 flights a day in 2025 according to JICA estimates. Hourly air traffic during peak hours in 2015 was 27 aircrafts per hour, which is supposed to increase to 47 aircrafts in 2025 according to JICA estimates. It is no longer possible to allow HSI Airport’s peak air traffic to operate smoothly without any delay with the existing 8 boarding bridges and belts. The insufficiency of boarding bridges caused severe delay during eid season in 2018 and is often the reason for delay in peak season. On the other hand, the existing terminals 1 and 2 have already reached the maximum number of boarding bridges. Therefore, a third terminal has become necessary for the HSI Airport.
Increasing Cargo Handling
Previously, Bangladesh was not a major exporter or importer. But following the economic liberalization, Bangladesh is currently the second largest RMG exporter in the world. That has increased the country’s reliance on air freight in the last decade. In 2015, Bangladesh handled about 260 thousand tonnes of international and local freight combined. According to JICA’s projection, it is supposed to reach 600 thousand tonnes by 2025 and 1 million tonnes in 2035. But HSI Airport only has a capacity to handle 200 thousand tonnes of cargo at this point.